Contractor AI Office Book a Demo →

Contractor AI Office  /  Guides  /  Roofing proposals

What goes in
a roofing proposal

A good roofing proposal does two jobs: it closes the sale at the table, and it settles any argument six months later. These are the parts that do both.

The parts every proposal needs

  1. Customer and property. Name, address and the roof sections covered.
  2. Scope of work. Tear-off, decking, underlayment, flashing, ventilation and cleanup, in plain words.
  3. Materials and colors. Manufacturer, product line and color, picked and written down.
  4. Package options. Two or three clear options, side by side, so the homeowner chooses between your packages instead of between you and a competitor.
  5. Price and payment terms. Total, deposit, when each payment is due and how they can pay.
  6. Warranty. What your workmanship warranty covers and for how long, in your own terms.
  7. Timeline and rain days. When work can start and how weather delays are handled.
  8. Signature and date. With the option to sign on the spot.

Present it, don't email it

A proposal sent by email gets compared on price. A proposal walked through at the kitchen table gets compared on value. Present it on a tablet, show the options and colors, and offer to sign there.

If they need time, send the link before you leave and book the follow-up call while you're still in the room.

After the signature

The deposit invoice should go out the same day, and the job should move straight to production with the colors and options attached. Every manual hand-off between sales and production is a chance for a detail to get lost.

Questions

Straight answers

Should a roofing proposal include good, better and best options?

Usually, yes. Two or three clear packages let the homeowner choose between your options, which keeps the conversation on value rather than on a competitor's price.

Keep reading

See how one roofing company runs all of this.

Thirty minutes on a live account that runs a real roofing company, then what your first 30 days would look like in your trade.